Health Physics Procedures
- HP-01: AREA MONITORS AND POOL LEVEL MONITOR CALIBRATION (PDF)
- HP-02: POOL pH READING AND INSTRUMENT CALIBRATIONS (PDF)
- HP-03: SURVEY INSTRUMENT CALIBRATION (PDF)
- HP-04: CAMPUS WIPE TEST (PDF)
- HP-05: SEALED SOURCE LEAK TESTS (PDF)
- HP-06: ACTIVITIES AND RELEASES (PDF)
- HP-07: POOL WATER AND HOLD-UP TANK WATER ANALYSIS (PDF)
- HP-08: RSO QUARTERLY REPORT (PDF)
- HP-09: INVENTORY PROGRAM AND DECOMMISSIONING FORM (PDF)
- HP-10: RADIATION SURVEYS (PDF)
- HP-11: LABORATORY SAFETY RULES (PDF)
- HP-12: LABORATORY SURVEYS (PDF)
- HP-13: LABORATORY EMERGENCY PROCEDURE (PDF)
- HP-14: PURCHASING AND RECEIPT OF RADIOACTIVE MATERIAL (PDF)
- HP-15: INSPECTION AND SURVEY OF RADIOACTIVE MATERIAL PACKAGES (PDF)
- HP-16: RADIOACTIVE MATERIAL RECEIPT AND DISPOSAL RECORD (PDF)
- HP-17: PERSONNEL AND AREA MONITORING (PDF)
- HP-18: GAS-FLOW PROPORTIONAL COUNTING (PDF)
- HP-19: GAS-FLOW PROPORTIONAL COUNTER PLATEAU CHECK (PDF)
- HP-20: RSO REACTOR FACILITY INSPECTION (PDF)
- HP-21: CALIBRATION OF THE GeLi DETECTOR (PDF)
- HP-22: CALIBRATION OF THE Ar-41 MONITOR (PDF)
- HP-23: OCCUPATIONAL EXPOSURE TO VISITORS (PDF)
- HP-24: ESTIMATION OF SKIN DOSE (PDF)
- HP-25: GENERAL NOTES FOR HANDLING TRITIUM
- HP-26: GENERAL NOTES FOR HANDLING C-14
- HP-27: GENERAL NOTES FOR HANDLING P-32
- HP-28: GENERAL NOTES FOR HANDLING P-33
- HP-29: GENERAL NOTES FOR HANDLING S-35